logo

To view the RDCL Website you need to have Javascript turned on.

Service

Construction Verification

Why

Ground improvement is often required for construction projects which might include  such things as removing non-suitable material and placement of engineered fill, piles or stabilisation. This process requires engineering inspections and construction records to document the process, to meet building standards and local government requirements.

What

Construction verification is determined by the geotechnical design and building/construction codes. Inspections of the removal and placement of material might include:

  • Confirmation of topsoil strip removal of organics
  • Placement of engineered fill
  • Compaction verification with NDM and Clegg Hammer
  • Placement of geo-grid or other composite fabrics

Issue of Producer Statement PS4.

How

A key part of construction verification is avoiding site delay.  RDCL understands the critical nature of construction schedules. We have teams of personnel at the ready to deploy to residential and commercial sites with a suite of tooling for construction verification. All testing is checked and verified through our quality management system and reports are issued with construction records and reports.

Hawke’s Bay
Te Matau-a-Māui
+64 6 877 1652
8/308 Queen Street East,
Hastings, Hawke’s Bay,
New Zealand
Map
Wellington
Te Whanganui-a-Tara
+64 4 282 1564
Unit 2, 2 Raiha St, Elsdon,
Porirua 5022, Wellington,
New Zealand.
Map
Auckland
Tāmaki Makaurau
+64 6 877 1652
Unit A3, 269a Mount Smart Rd, Onehunga, Auckland 1061, New Zealand.
Map
Philippines
Pilipinas
+63 916 276 3133 (Admin)+63 917 184 5147 (Technical)
Unit 2106, Prestige Tower,
F. Ortigas Jr. Road, Ortigas Center, Pasig City 1605, Metro Manila, Philippines.
Map